Representative Delay Analysis Experience 

SampleDelay.jpg

Waste Water Treatment Plant, Oceanside, Ca.

$53 million project to increase the plant’s capacity.  Reviewed contemporaneous correspondence and project CPM schedules, developed issue files and delay analysis in preparation for trial.

 

Bio-Medical Engineering Building, Piscataway, NJ

Reviewed contemporaneous correspondence and project CPM schedules, developed issue files and delay analysis and prepared time extension request on behalf of contractor.

 

Regional School District, North Caldwell, NJ

Analysis of project schedules and contractor alleged delays, prepared summary graphics demonstrating project impacts.

 

Regional School District, Warren, NJ

Analysis of project schedules and contractor alleged delays, prepared summary graphics demonstrating project impacts.

 

Underground Steam Pipe Installation, Union, NJ

Analysis of contractor’s schedule, developed detailed as-built schedule, prepared delay analysis of contractor’s claim and prepared expert report.

 

Highway Rehabilitation & Replacement, Hamilton, NJ

Evaluation of contractor’s claim, developed detailed as-built schedule, performed delay analysis of contractor’s claim and prepared expert report.

 

Bridge Replacement, Belmar, NJ

Evaluation of contractor’s claim, developed detailed as-built schedule, prepared delay analysis of contractor’s claim and prepared expert report.

 

Residence Hall Complex,  Old Westbury, NY

$34 million project.  Prepared detailed schedule delay analysis, prepared time extension request report on behalf of the contractor.

 

Bridge Replacement, Ocean City, NJ

Evaluated the contractor’s claim, developed detailed as-built schedule, performed delay analysis of contractor’s claim. Prepared expert report.  Provided testimony before the Dispute Review Board and at Mediation.

 

High Security Greenhouse Building, Beltsville, Maryland

Performed a detailed schedule delay analysis on behalf of the contractor.  Assisted in settlement discussions with Owner

 

Aquaculture Facility, Kearneysville, WV

Performed a detailed schedule delay analysis on behalf of the contractor.

     

            Rail Station and Line, Washington, DC

Performed a detailed schedule delay analysis. Prepared a detailed as-built schedule for the construction of a rail station and line.

 

Bridge Replacement, East Rutherford, NJ

$31.5 million project. Analyzed the contractor’s acceleration claim, performed a detailed schedule delay analysis.

 

Transit Complex, Hamilton, NJ

Assisted the contractor with preparation of its delay damages incurred during the construction of the rail station and bus maintenance facility.

 

Prison, Brooklyn, NY

Performed a detailed schedule delay analysis, prepared a detailed As-Built schedule, assisted in the development of an expert report, assisted in the preparation of interrogatories and depositions, performed document discoveries, developed issue files utilizing computerized document management system, assisted in the preparation of trial exhibits and assembly of trial exhibits.

                 

            Tunnel Construction, Leighton, PA

Performed detailed schedule delay analysis on behalf of the design professional where the Owner was seeking damages due alleged design deficiencies.

 

Combined Sewer Tunnel, Birmingham, Michigan

Developed as-planned/as-built schedules graphics, performed a productivity analysis, performed detailed schedule delay analysis.

                      

            High-Rise, New York, NY
            Schedule and damages analysis and litigation support for claims/counterclaims relating to
            HVAC and granite curtainwall issues on a 48 story building.  Alleged issues included design
            errors, poor workmanship, and fabrication delays.